ID :
60239
Tue, 05/12/2009 - 18:00
Auther :

SR 142m Designing Contract for Haramain High Speed Train Stations Signed 2 Riyadh

Dr al-Sireisiri said these Railway stations will be located in
Makkah, Madinah, Jeddah and Rabigh.


Dr al-Sireisiri pointed out that Foster company is one of the
greatest specialized companies in the field of engineering designing.

On his part, SRO President Abdulaziz Al-Hukeil said the SRO in
cooperation with the representatives of the World Bank and the
General Investments Fund is finalizing the documents of the second
phase of the project.


--SPA

X