ID :
173796
Thu, 04/07/2011 - 12:31
Auther :

COURSE OF NEW RAILWAY RUNNING INTRODUCED

Ulaanbaatar, Mongolia, /MONTSAME/ A Minister of Road, Transportation, Construction and Urban Development Kh.Battulga has introduced the cabinet to a course of the project on constructing a railway in route Dalanzadgad-Tavan tolgoi-Sainshand-Choibalsan.
In accordance with the governmental resolution, the "Mongolian railway" state-owned stock company has been granted a special license to construct a basic structure of the railway in the route. The Minister has said related measures are being taken for determining the railway lines and size, set up a professional group for conducting engineering, geology, geodesy and environment detailed research, solve financial resources needed for running the basic structure of the new railway and drawing up technical and economic justification and design.
Other steps are taken to select an advisory company and to ensure a preparation for establishing a consortium with participation of foreign and domestic investors.
B.Khuder

X